Energy Verification for Overseas Plants and Large Buildings

Energy Commissioning

Energy Verification for Overseas Plants and Large Buildings

An integrated energy verification project combining building data, b.IoT control, and field reports.
Energy Commissioning

Building-based energy commissioning

An integrated energy verification project covering overseas b.IoT system and controller supply, building energy simulation, and field validation.

b.IoTSimulationVerification
3Customer Issues
5Scope Items
4Detail Groups
7Evidence Assets
Customer Issue

Customer Issue

  • Expand factory-specific b.IoT solutions across business sites to reduce energy consumption
  • Accelerate deployment across group companies and business divisions
  • Register climate response as a long-term program and expand implementation to overseas subsidiaries
Scope of Work

Scope of Work

  • Analyzed building environments and energy data
  • Reviewed b.IoT system and controller application
  • Applied and analyzed HVAC operation algorithms
  • Compared existing loads, energy use, and optimization results
  • Reported field verification results and savings
Detailed Scope

Detailed Scope

Chennai Plant, India
01

Chennai Plant, India

Energy commissioning and b.IoT savings verification for an overseas production site.

  • Analyzed energy, indoor environment, and HVAC system conditions
  • Reviewed b.IoT-based energy-saving algorithm application
  • Calculated savings based on field verification data
Samsung Electronics SEVT
02

Samsung Electronics SEVT

b.IoT applicability verification based on production-site HVAC operation data.

  • Analyzed HVAC operation data for the production facility
  • Reviewed controller system application conditions
  • Reported energy-saving effects and improvement direction
Samsung Electronics R4·R5 Buildings
03

Samsung Electronics R4·R5 Buildings

Energy optimization comparison and verification reporting for large office facilities.

  • Compared R4 existing building load and energy use with optimization results
  • Reviewed R5 against LEED Platinum criteria and performed energy commissioning
  • Projected R5 energy efficiency impact and reported approximately KRW 350 million in savings
Samsung Electronics Poland Plant
04

Samsung Electronics Poland Plant

b.IoT system and controller supply with field verification.

  • Supplied b.IoT system and controller system
  • Reviewed control applicability for the overseas plant environment
  • Analyzed field application results and issued verification reports
Field Sites

Field Sites

  • Chennai, India plant: energy commissioning and b.IoT energy savings verification
  • Samsung Electronics SEVT production subsidiary: energy commissioning and b.IoT energy savings verification
  • Samsung Electronics R5 building: LEED Platinum review, energy commissioning, and verification report
  • Samsung Electronics R4 building: comparison of existing load, energy use, and optimization results
  • Samsung Electronics Poland plant: b.IoT system and controller supply, energy commissioning, and verification